March Station

Abellio Greater Anglia – March Station 

Project Brief

Rothwell Group Ltd has been responsible for the procurement, installation, testing and commissioning of the electrical and mechanical services.

The project at March Station is based on a design & build by Rothwell Group Ltd and now completed provides updated power and lighting throughout the station, its buildings and the car park.

The works undertaken by RGL is listed below

  • Site Set up.
  • To install a new REC supply into the existing LV Switch Room on Platform 1
  • To supply and fit a new MCB Distribution board within the existing LV Switch Room including all new bracketry and containment.
  • To install a new feeder cable to Platform 2 from the existing LV switch room adjacent to Platform 2
  • Install stainless steel kiosks on Platforms 1 & 2 and provide MCB distribution boards within.
  • Install new lighting and power including all containment and wiring to platforms 1 & 2
  • Install new power and lighting including all containment and wiring to toilets, waiting rooms, the Ticket office and the Booking Hall.
  • Works required in loft space above the ticket hall to include lighting & floor boarding
  • Install new sub main cabling to Friends of March Station rooms, S & T Rooms and redundant rooms
  • Install new LED column lighting to Platform 2 access foot path.
  • Install 19 No. new columns and LED lighting to the main station car park
  • Replace 2 No. existing columns on Platform 2 and replace fittings with LED fittings
  • Replace 1 No. existing column on Platform 1 and replace fitting with LED fitting
  • Install 1 No. new column on Platform 1 complete with a LED fitting
  • All civil’s works – trenching, ducting and making good.
  • Provide new led lighting to Platforms 1 & 2
  • Provide new led lighting inclusive of containment and wiring to the existing footbridge
  • Provide new heating and ventilation to staff toilet, staff kitchen area and ticket Office
  • Provide new heating to the 2 no waiting rooms.
  • Strip out existing electrical services following the installation of new
  • Fully test & commission on completion
  • Clear site
  • Provide all ‘as fitted’ drawings, O & M manual and certification.

The whole of the electrical system has been designed and installed to meet the Wiring Regulations 17th Edition BS 7671:2008. incorporating amendment 3:2015 & BS 5266-1:2011 Emergency lighting – Part 1: Code of practice for the emergency escape lighting of premises.