{"id":3292,"date":"2019-11-08T08:48:06","date_gmt":"2019-11-08T08:48:06","guid":{"rendered":"http:\/\/rothwell-group.co.uk\/?post_type=portfolio&#038;p=3292"},"modified":"2020-12-15T14:59:02","modified_gmt":"2020-12-15T14:59:02","slug":"march-station","status":"publish","type":"portfolio","link":"https:\/\/rothwell-group.co.uk\/index.php\/projects\/march-station\/","title":{"rendered":"March Station"},"content":{"rendered":"<p><strong>Abellio Greater Anglia \u2013 March Station\u00a0<\/strong><\/p>\n<h4 class=\"alternative-heading\">Project Brief<\/h4>\n<p>Rothwell Group Ltd has been responsible for the procurement, installation, testing and commissioning of the electrical and mechanical services.<\/p>\n<p>The project at March Station is based on a design &amp; build by Rothwell Group Ltd and now completed provides updated power and lighting throughout the station, its buildings and the car park.<\/p>\n<h4 class=\"alternative-heading\">The works undertaken by RGL is listed below<\/h4>\n<ul>\n<li>Site Set up.<\/li>\n<li>To install a new REC supply into the existing LV Switch Room on Platform 1<\/li>\n<li>To supply and fit a new MCB Distribution board within the existing LV Switch Room including all new bracketry and containment.<\/li>\n<li>To install a new feeder cable to Platform 2 from the existing LV switch room adjacent to Platform 2<\/li>\n<li>Install stainless steel kiosks on Platforms 1 &amp; 2 and provide MCB distribution boards within.<\/li>\n<li>Install new lighting and power including all containment and wiring to platforms 1 &amp; 2<\/li>\n<li>Install new power and lighting including all containment and wiring to toilets, waiting rooms, the Ticket office and the Booking Hall.<\/li>\n<li>Works required in loft space above the ticket hall to include lighting &amp; floor boarding<\/li>\n<li>Install new sub main cabling to Friends of March Station rooms, S &amp; T Rooms and redundant rooms<\/li>\n<li>Install new LED column lighting to Platform 2 access foot path.<\/li>\n<li>Install 19 No. new columns and LED lighting to the main station car park<\/li>\n<li>Replace 2 No. existing columns on Platform 2 and replace fittings with LED fittings<\/li>\n<li>Replace 1 No. existing column on Platform 1 and replace fitting with LED fitting<\/li>\n<li>Install 1 No. new column on Platform 1 complete with a LED fitting<\/li>\n<li>All civil\u2019s works \u2013 trenching, ducting and making good.<\/li>\n<li>Provide new led lighting to Platforms 1 &amp; 2<\/li>\n<li>Provide new led lighting inclusive of containment and wiring to the existing footbridge<\/li>\n<li>Provide new heating and ventilation to staff toilet, staff kitchen area and ticket Office<\/li>\n<li>Provide new heating to the 2 no waiting rooms.<\/li>\n<li>Strip out existing electrical services following the installation of new<\/li>\n<li>Fully test &amp; commission on completion<\/li>\n<li>Clear site<\/li>\n<li>Provide all \u2018as fitted\u2019 drawings, O &amp; M manual and certification.<\/li>\n<\/ul>\n<p>The whole of the electrical system has been designed and installed to meet the Wiring Regulations 17th Edition BS 7671:2008. incorporating amendment 3:2015 &amp; BS 5266-1:2011 Emergency lighting &#8211; Part 1: Code of practice for the emergency escape lighting of premises.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Abellio Greater Anglia \u2013 March Station Re-Wire \u2013 Electrical, Mechanical &#038; Civil\u2019s.<\/p>\n","protected":false},"author":1,"featured_media":3713,"comment_status":"closed","ping_status":"open","template":"","meta":[],"portfolio_category":[85],"portfolio_tag":[],"_links":{"self":[{"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio\/3292"}],"collection":[{"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=3292"}],"version-history":[{"count":8,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio\/3292\/revisions"}],"predecessor-version":[{"id":3715,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio\/3292\/revisions\/3715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/media\/3713"}],"wp:attachment":[{"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=3292"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio_category?post=3292"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/rothwell-group.co.uk\/index.php\/wp-json\/wp\/v2\/portfolio_tag?post=3292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}